Projects

PCD-175

Presentation from December 22, 2016 Public Meeting

Oslo Access Study

Oslo Access Phase 1 Study  

Middle-Snake Rivers WRAPS Monitoring and Assessment Report

Middle-Snake Rivers WRAPS Monitoring and Assessment Report

Middle River Subwatershed Feasibility Study

Middle River Subwatershed Feasibility Study December 8, 2016 Meeting Minutes  

JD #19 RCPP

JD19 RCPP Review Point 1 September 26, 2016 Public Meeting-Presentation September 26, 2016 Public Meeting-Questionaire September 26, 2016 Public Meeting-Minutes Red River Basin Timing Zones  

JD #14 RCPP

Questionaire-JD #14 Scoping Meeting JD14 RCPP Review Point 1  

Angus Oslo #1

 

Snake & Middle Rivers Watershed Restoration and Protection Strategy (WRAPS)

The Snake & Middle Rivers WRAPS is being conducted by the MN Pollution Control Agency for the Snake and Middle Rivers. Middle & Snake River Drainage Areas                           Snake … Continue reading

Tamarac River Watershed Restoration and Protection Strategy (WRAPS)

The Tamarac River WRAP is being conducted by the MN Pollution Control Agency in conjunction with portions of the Two Rivers & Joe River Watershed District’s. MPCA Monitor & Assessment Report  

Grand Marais Creek Watershed Restoration and Protection Strategy (WRAPS)

Grand Marais Creek WRAP Announcement

Final 10 Year Watershed Management Plan

The Mission of the Middle Snake Tamarac Rivers Watershed District is to manage the District’s resources for the efficient movement of water across the District for purposes of reducing flooding, providing agricultural drainage and to protect and improve water quality.  … Continue reading

Existing and Proposed Flood Retention Sites Map Layers

An interactive layered District map which allows focusing of map attributes Continue reading

Agassiz Valley Water Resource Management

This project is in both Marshall and Polk Counties and comprises 4 square miles. The drainage area above the impoundment is approximately 31.6 square miles. The gated water storage is 6,840 acre feet, ungated is 10,670 acre feet. Continue reading

Brandt/Angus Coulee Impoundment

This future flood retention site will be in the south half of 18 and all of section 19 in Brandt Township. The location is 10 miles south of
Warren, (2 miles south of Angus) and 2.5 miles east.
Continue reading

Farmstead Ring Dikes

MSTRWD has established an 80% cost share program for the design and construction of farmstead ring dikes and the upgrade of existing ring dikes. Continue reading

 

News

2017 BOARD MEETING SCHEDULE

2017 Board Meeting Schedule

New Map Viewer

 

MSTRWD now has an online watershed viewer which will allow you to query projects with in the watershed. Click here to try it out.

MapMaps

Navigate the
Middle-Snake-Tamarac Rivers Watershed District.

Contact

453 N McKinley St

PO Box 154
Warren, MN 56762

Phone: 218-745-4741
Fax: 218-745-5300
E-mail: mstrwd@hotmail.com